Begin with your proposed home

Write down the size and use you have in mind, including an accessory dwelling, garage, or other improvements. Have the relevant agency and a qualified design professional evaluate zoning, setbacks, easements, site constraints, and the approval path for that specific proposal.

Identify jurisdiction using the parcel, not just the mailing address. Land in Paradise and nearby unincorporated areas may require different agency contacts. Do not treat a listing’s “buildable” description as a complete feasibility review.

A previous home is a research lead

A former homesite may have useful records, but it does not establish that a foundation, septic system, utility connection, or prior permit can be reused. Collect available cleanup records, demolition information, surveys, prior plans, and agency correspondence. Ask the responsible professionals what is usable and what must be replaced or tested.

Request a current fee estimate for your proposed project. If someone mentions credits, waivers, or prior-development benefits, ask the agency to confirm their applicability to this parcel and your timing in writing.

Price the connections, not their proximity

Contact the actual water provider about the account, meter, lateral, reconnection requirements, and costs. Ask the electric utility about design, capacity, trenching, easements, and timing. A service line nearby is not an installed service ready for your house.

Evaluate wastewater feasibility early. Obtain prior septic records, discuss the proposed house size and site plan with qualified professionals, and identify required approvals. Keep any future sewer planning separate from the wastewater solution needed for your current build.

Check access, terrain, and construction logistics

Review legal access and title exceptions, then compare them to the route a construction crew and emergency vehicle would use. Investigate driveway grades, turnarounds, drainage, private-road obligations, and staging space.

A survey and site-specific soils or grading work may materially change the design and budget. Ask qualified professionals which investigations are needed before you remove contingencies or spend heavily on plans.

Build the whole project budget

Add land, professional design, permits and fees, investigations, utility work, grading, drainage, construction, insurance, financing, and a contingency. Identify which numbers are written estimates and which remain allowances.

Ask a lender about land and construction financing for this exact situation. Approval for a conventional finished-home purchase does not by itself confirm eligibility for a vacant lot or construction project. Include loan carrying costs and a realistic delay allowance.

Use a go / pause decision

Before committing, list the issues that would make the project unworkable: uncertain access, unconfirmed wastewater feasibility, unaffordable utility work, or financing that does not fit. Assign each one an evidence source and a decision deadline. An inexpensive parcel is only useful if the resulting project works for you.

Your land / rebuild property checklist

Open checklists only
PARADISE PROPERTY NOTES0 of 14 noted

Land / Rebuild Property checklist

These notes support investigation; a checked box is not professional verification.